South Hays 230kV (GEN-2026-PR7)

South Hays 230kV is a 39.8 MW wind interconnection project in Brownell County, Kansas with a current status of active. It is proposed to connect at South Hays 230kV.

39.8 MWCapacity
ActiveStatus
KSMarket
WindTechnology

Project facts

Canonical nameSouth Hays 230kV
Queue IDGEN-2026-PR7
Statusactive
Source statusSPECIAL STUDY
MarketKS
TechnologyWind
Capacity39.8 MW
StateKansas
CountyBrownell County
Point of interconnectionSouth Hays 230kV
Requested (queue) date2026-02-28
Proposed in-service date2027-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerMIDW

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata