Southeast Queue Project 175 — Nuclear in an unlisted county, the U.S.
Southeast Queue Project 175 — Nuclear in an unlisted county, the U.S. is a 30.0 MW nuclear interconnection project with a current status of operational. It is proposed to connect at Turkey Point Sub.
30.0 MWCapacity
OperationalStatus
SoutheastMarket
NuclearTechnology
Project facts
| Canonical name | Southeast Queue Project 175 — Nuclear in an unlisted county, the U.S. |
|---|---|
| Queue ID | 175 |
| Status | operational |
| Source status | operational |
| Market | Southeast |
| Technology | Nuclear |
| Capacity | 30.0 MW |
| State | — |
| County | — |
| Point of interconnection | Turkey Point Sub |
| Requested (queue) date | 2016-01-21 |
| Proposed in-service date | — |
| Operational date | 2020-10-31 |
| Withdrawn date | — |
| Developer | FPL |
| Utility / transmission owner | Florida Power & Light |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata