Southeast Queue Project 183 — Solar in an unlisted county, the U.S.

Southeast Queue Project 183 — Solar in an unlisted county, the U.S. is a 74.5 MW solar interconnection project with a current status of operational. It is proposed to connect at Bradford-Putnam 115kV.

74.5 MWCapacity
OperationalStatus
SoutheastMarket
SolarTechnology

Project facts

Canonical nameSoutheast Queue Project 183 — Solar in an unlisted county, the U.S.
Queue ID183
Statusoperational
Source statusoperational
MarketSoutheast
TechnologySolar
Capacity74.5 MW
State
County
Point of interconnectionBradford-Putnam 115kV
Requested (queue) date2016-04-18
Proposed in-service date
Operational date2020-01-01
Withdrawn date
DeveloperFPL
Utility / transmission ownerFlorida Power & Light

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.