Southeast Queue Project 455 — Battery in Clay, Mississippi

Southeast Queue Project 455 — Battery in Clay, Mississippi is a 50.0 MW battery interconnection project in Clay, Mississippi with a current status of withdrawn.

50.0 MWCapacity
WithdrawnStatus
SoutheastMarket
BatteryTechnology

Project facts

Canonical nameSoutheast Queue Project 455 — Battery in Clay, Mississippi
Queue ID455
Statuswithdrawn
Source statuswithdrawn
MarketSoutheast
TechnologyBattery
Capacity50.0 MW
StateMississippi
CountyClay
Point of interconnection
Requested (queue) date2020-08-13
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerTennessee Valley Authority

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.