Southeast Queue Project 656 — Gas in Benton, Mississippi

Southeast Queue Project 656 — Gas in Benton, Mississippi is a 54.0 MW gas interconnection project in Benton, Mississippi with a current status of active. It is proposed to connect at Magnolia CC Plant.

54.0 MWCapacity
ActiveStatus
SoutheastMarket
GasTechnology

Project facts

Canonical nameSoutheast Queue Project 656 — Gas in Benton, Mississippi
Queue ID656
Statusactive
Source statusactive
MarketSoutheast
TechnologyGas
Capacity54.0 MW
StateMississippi
CountyBenton
Point of interconnectionMagnolia CC Plant
Requested (queue) date2024-10-01
Proposed in-service date2030-02-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerTennessee Valley Authority

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata