Southeast Queue Project 8615 — Other in Florence, South Carolina
Southeast Queue Project 8615 — Other in Florence, South Carolina is a 10.0 MW other interconnection project in Florence, South Carolina with a current status of operational. It is proposed to connect at Florence Stone Container 115kV Switching Station.
Project facts
| Canonical name | Southeast Queue Project 8615 — Other in Florence, South Carolina |
|---|---|
| Queue ID | 8615 |
| Status | operational |
| Source status | operational |
| Market | Southeast |
| Technology | Other |
| Capacity | 10.0 MW |
| State | South Carolina |
| County | Florence |
| Point of interconnection | Florence Stone Container 115kV Switching Station |
| Requested (queue) date | 2012-05-10 |
| Proposed in-service date | — |
| Operational date | 2012-01-01 |
| Withdrawn date | — |
| Developer | RockTenn CP, LLC |
| Utility / transmission owner | Duke Energy Progress |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata