Southeast Queue Project 917997 — Solar in Marlboro, South Carolina
Southeast Queue Project 917997 — Solar in Marlboro, South Carolina is a 74.9 MW solar interconnection project in Marlboro, South Carolina with a current status of withdrawn. It is proposed to connect at BENNETTSVILLE SW STA - LAURINBURG 230KV - FLOR.
Project facts
| Canonical name | Southeast Queue Project 917997 — Solar in Marlboro, South Carolina |
|---|---|
| Queue ID | 917997 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | Southeast |
| Technology | Solar |
| Capacity | 74.9 MW |
| State | South Carolina |
| County | Marlboro |
| Point of interconnection | BENNETTSVILLE SW STA - LAURINBURG 230KV - FLOR |
| Requested (queue) date | 2023-09-29 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Duke Energy Progress |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata