Southeast Queue Project IC-1208 — Solar in Lowndes, Alabama

Southeast Queue Project IC-1208 — Solar in Lowndes, Alabama is a 120.0 MW solar interconnection project in Lowndes, Alabama with a current status of withdrawn. It is proposed to connect at Burkville Substation 115 kV Bus.

120.0 MWCapacity
WithdrawnStatus
SoutheastMarket
SolarTechnology

Project facts

Canonical nameSoutheast Queue Project IC-1208 — Solar in Lowndes, Alabama
Queue IDIC-1208
Statuswithdrawn
Source statuswithdrawn
MarketSoutheast
TechnologySolar
Capacity120.0 MW
StateAlabama
CountyLowndes
Point of interconnectionBurkville Substation 115 kV Bus
Requested (queue) date2023-12-01
Proposed in-service date2027-02-26
Operational date
Withdrawn date2025-01-30
Developer
Utility / transmission ownerSouthern Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.