Southeast Queue Project IC-877 — Solar in Hale, Alabama

Southeast Queue Project IC-877 — Solar in Hale, Alabama is a 100.0 MW solar interconnection project in Hale, Alabama with a current status of withdrawn. It is proposed to connect at Demopolis - Greensboro 115 kV Line.

100.0 MWCapacity
WithdrawnStatus
SoutheastMarket
SolarTechnology

Project facts

Canonical nameSoutheast Queue Project IC-877 — Solar in Hale, Alabama
Queue IDIC-877
Statuswithdrawn
Source statuswithdrawn
MarketSoutheast
TechnologySolar
Capacity100.0 MW
StateAlabama
CountyHale
Point of interconnectionDemopolis - Greensboro 115 kV Line
Requested (queue) date2020-06-01
Proposed in-service date
Operational date
Withdrawn date2021-01-14
Developer
Utility / transmission ownerSouthern Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata