Southeast Queue Project PP00039 — Other in Darlington, South Carolina

Southeast Queue Project PP00039 — Other in Darlington, South Carolina is a 70.0 MW other interconnection project in Darlington, South Carolina with a current status of withdrawn. It is proposed to connect at Robinson - Florence 230.

70.0 MWCapacity
WithdrawnStatus
SoutheastMarket
OtherTechnology

Project facts

Canonical nameSoutheast Queue Project PP00039 — Other in Darlington, South Carolina
Queue IDPP00039
Statuswithdrawn
Source statuswithdrawn
MarketSoutheast
TechnologyOther
Capacity70.0 MW
StateSouth Carolina
CountyDarlington
Point of interconnectionRobinson - Florence 230
Requested (queue) date2025-08-13
Proposed in-service date2027-08-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata