Southeast Queue Project PP00053 — Other in Darlington, South Carolina
Southeast Queue Project PP00053 — Other in Darlington, South Carolina is a 25.0 MW other interconnection project in Darlington, South Carolina with a current status of active. It is proposed to connect at Robinson Plant ‚Äì Camden Junction 115.
25.0 MWCapacity
ActiveStatus
SoutheastMarket
OtherTechnology
Project facts
| Canonical name | Southeast Queue Project PP00053 — Other in Darlington, South Carolina |
|---|---|
| Queue ID | PP00053 |
| Status | active |
| Source status | active |
| Market | Southeast |
| Technology | Other |
| Capacity | 25.0 MW |
| State | South Carolina |
| County | Darlington |
| Point of interconnection | Robinson Plant – Camden Junction 115 |
| Requested (queue) date | 2025-10-29 |
| Proposed in-service date | 2027-09-15 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Duke Energy Progress |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata