Southridge Substation (L0372)
Southridge Substation is a 9.0 MW other interconnection project in Franklin, Washington with a current status of operational. It is proposed to connect at BPA's Franklin-Badger Canyon #1 115kV line.
9.0 MWCapacity
OperationalStatus
WAMarket
OtherTechnology
Project facts
| Canonical name | Southridge Substation |
|---|---|
| Queue ID | L0372 |
| Status | operational |
| Source status | ENERGIZED |
| Market | WA |
| Technology | Other |
| Capacity | 9.0 MW |
| State | Washington |
| County | Franklin |
| Point of interconnection | BPA's Franklin-Badger Canyon #1 115kV line |
| Requested (queue) date | 2014-06-03 |
| Proposed in-service date | — |
| Operational date | 2017-10-01 |
| Withdrawn date | — |
| Developer | Public Utility District No. 1 of Cowlitz County |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.