Spencer Creek 345 kV Substation (J1026)

Spencer Creek 345 kV Substation is a 400.0 MW wind interconnection project in Audrain County,Ralls County, Missouri with a current status of operational. It is proposed to connect at Spencer Creek 345 kV Substation.

400.0 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameSpencer Creek 345 kV Substation
Queue IDJ1026
Statusoperational
Source statusDone
Market
TechnologyWind
Capacity400.0 MW
StateMissouri
CountyAudrain County,Ralls County
Point of interconnectionSpencer Creek 345 kV Substation
Requested (queue) date2018-03-12
Proposed in-service date2020-09-30
Operational date2020-09-30
Withdrawn date
Developer
Utility / transmission ownerAmeren Missouri

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.