Spencer Creek - Montgomery 345 kV Line Tap (J1363)

Spencer Creek - Montgomery 345 kV Line Tap is a 150.0 MW solar interconnection project in Audrain County, Missouri with a current status of withdrawn. It is proposed to connect at Spencer Creek - Montgomery 345 kV Line Tap.

150.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameSpencer Creek - Montgomery 345 kV Line Tap
Queue IDJ1363
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity150.0 MW
StateMissouri
CountyAudrain County
Point of interconnectionSpencer Creek - Montgomery 345 kV Line Tap
Requested (queue) date2019-04-26
Proposed in-service date2022-07-15
Operational date2022-07-15
Withdrawn date2021-08-05
Developer
Utility / transmission ownerAmeren Missouri

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata