Spruce Ridge Wind CNR (see Q390) (421)
Spruce Ridge Wind CNR (see Q390) is a 50.8 MW wind interconnection project in Grafton, New Hampshire with a current status of withdrawn. It is proposed to connect at NGRID 230 kV Comerford/Dunbarton Line.
50.8 MWCapacity
WithdrawnStatus
NHMarket
WindTechnology
Project facts
| Canonical name | Spruce Ridge Wind CNR (see Q390) |
|---|---|
| Queue ID | 421 |
| Status | withdrawn |
| Source status | W |
| Market | NH |
| Technology | Wind |
| Capacity | 50.8 MW |
| State | New Hampshire |
| County | Grafton |
| Point of interconnection | NGRID 230 kV Comerford/Dunbarton Line |
| Requested (queue) date | 2013-07-18 |
| Proposed in-service date | 2017-10-31 |
| Operational date | — |
| Withdrawn date | 2017-04-10 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata