Square Butte 230 kV Substation East (J2502)

Square Butte 230 kV Substation East is a 150.0 MW wind interconnection project in Morton, North Dakota with a current status of operational. It is proposed to connect at Square Butte 230 kV Substation East.

150.0 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameSquare Butte 230 kV Substation East
Queue IDJ2502
Statusoperational
Source statusActive
Market
TechnologyWind
Capacity150.0 MW
StateNorth Dakota
CountyMorton
Point of interconnectionSquare Butte 230 kV Substation East
Requested (queue) date2022-09-13
Proposed in-service date2025-02-27
Operational date2025-02-27
Withdrawn date
Developer
Utility / transmission ownerMINNESOTA POWER INC.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata