Square Butte 230kV Substation (J766)

Square Butte 230kV Substation is a 3.8 MW wind interconnection project in Oliver County, North Dakota with a current status of withdrawn. It is proposed to connect at Square Butte 230kV Substation.

3.8 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameSquare Butte 230kV Substation
Queue IDJ766
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity3.8 MW
StateNorth Dakota
CountyOliver County
Point of interconnectionSquare Butte 230kV Substation
Requested (queue) date2016-11-14
Proposed in-service date2018-01-01
Operational date2018-01-01
Withdrawn date2019-04-09
Developer
Utility / transmission ownerMINNESOTA POWER INC.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.