St. Francis Tap 115 kV Substation (GEN-2024-210)

St. Francis Tap 115 kV Substation is a 150.0 MW solar interconnection project in Cheyenne, Kansas with a current status of withdrawn. It is proposed to connect at St. Francis Tap 115 kV Substation.

150.0 MWCapacity
WithdrawnStatus
KSMarket
SolarTechnology

Project facts

Canonical nameSt. Francis Tap 115 kV Substation
Queue IDGEN-2024-210
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologySolar
Capacity150.0 MW
StateKansas
CountyCheyenne
Point of interconnectionSt. Francis Tap 115 kV Substation
Requested (queue) date2025-03-01
Proposed in-service date2028-06-30
Operational date
Withdrawn date2026-05-21
Developer
Utility / transmission ownerSUNC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata