St. Lawrence Wind Farm II (0167)

St. Lawrence Wind Farm II is a 80.0 MW wind interconnection project in Jefferson, New York with a current status of withdrawn. It is proposed to connect at Lyme Substation.

80.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameSt. Lawrence Wind Farm II
Queue ID0167
Statuswithdrawn
Source status0
Market
TechnologyWind
Capacity80.0 MW
StateNew York
CountyJefferson
Point of interconnectionLyme Substation
Requested (queue) date2005-02-08
Proposed in-service date2019-06-05
Operational date
Withdrawn date
DeveloperAES DE DEVCO NC LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata