Steelhead 230 kV (L0661)

Steelhead 230 kV is a 600.0 MW other interconnection project with a current status of active. It is proposed to connect at Sixmile Canyon Substation at 230 kV.

600.0 MWCapacity
ActiveStatus
Market
OtherTechnology

Project facts

Canonical nameSteelhead 230 kV
Queue IDL0661
Statusactive
Source statusSTUDY
Market
TechnologyOther
Capacity600.0 MW
State
CountyMorrow, Or
Point of interconnectionSixmile Canyon Substation at 230 kV
Requested (queue) date2025-07-31
Proposed in-service date2027-12-12
Operational date
Withdrawn date
DeveloperUmatilla Electric Cooperative
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata