Steelhead 230 kV (L0661)
Steelhead 230 kV is a 600.0 MW other interconnection project with a current status of active. It is proposed to connect at Sixmile Canyon Substation at 230 kV.
600.0 MWCapacity
ActiveStatus
—Market
OtherTechnology
Project facts
| Canonical name | Steelhead 230 kV |
|---|---|
| Queue ID | L0661 |
| Status | active |
| Source status | STUDY |
| Market | — |
| Technology | Other |
| Capacity | 600.0 MW |
| State | — |
| County | Morrow, Or |
| Point of interconnection | Sixmile Canyon Substation at 230 kV |
| Requested (queue) date | 2025-07-31 |
| Proposed in-service date | 2027-12-12 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Umatilla Electric Cooperative |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.