Stetson Wind II(Jimmey & Owl Mt.-UPC) (249)

Stetson Wind II(Jimmey & Owl Mt.-UPC) is a 2.2 MW wind interconnection project in Washington, Maine with a current status of operational. It is proposed to connect at BHE Keene Road Substation.

2.2 MWCapacity
OperationalStatus
BHEMarket
WindTechnology

Project facts

Canonical nameStetson Wind II(Jimmey & Owl Mt.-UPC)
Queue ID249
Statusoperational
Source statusC
MarketBHE
TechnologyWind
Capacity2.2 MW
StateMaine
CountyWashington
Point of interconnectionBHE Keene Road Substation
Requested (queue) date2008-02-04
Proposed in-service date
Operational date2010-03-12
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata