Stetson Wind Phase I (185)

Stetson Wind Phase I is a 60.0 MW wind interconnection project in Penobscot, Maine with a current status of operational. It is proposed to connect at BHE Keene Road 115 kV substation.

60.0 MWCapacity
OperationalStatus
BHEMarket
WindTechnology

Project facts

Canonical nameStetson Wind Phase I
Queue ID185
Statusoperational
Source statusC
MarketBHE
TechnologyWind
Capacity60.0 MW
StateMaine
CountyPenobscot
Point of interconnectionBHE Keene Road 115 kV substation
Requested (queue) date2006-11-22
Proposed in-service date
Operational date2009-01-22
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.