Stillwater Facility (50765_1)

Stillwater Facility is a 22.0 MW solar interconnection project in Churchill, Nevada with a current status of operational.

22.0 MWCapacity
OperationalStatus
NEVPMarket
SolarTechnology

Project facts

Canonical nameStillwater Facility
Queue ID50765_1
Statusoperational
Source status(OP) Operating
MarketNEVP
TechnologySolar
Capacity22.0 MW
StateNevada
CountyChurchill
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2012-04-01
Withdrawn date—
Developer—
Utility / transmission ownerOrmat Stillwater LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata