Stillwater Northtap 138 kV Substation (GEN-2024-247)

Stillwater Northtap 138 kV Substation is a 456.6 MW gas interconnection project in Payne, Oklahoma with a current status of withdrawn. It is proposed to connect at Stillwater Northtap 138 kV Substation.

456.6 MWCapacity
WithdrawnStatus
OKMarket
GasTechnology

Project facts

Canonical nameStillwater Northtap 138 kV Substation
Queue IDGEN-2024-247
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyGas
Capacity456.6 MW
StateOklahoma
CountyPayne
Point of interconnectionStillwater Northtap 138 kV Substation
Requested (queue) date2025-03-01
Proposed in-service date2030-05-01
Operational date
Withdrawn date2026-05-21
Developer
Utility / transmission ownerGRDA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata