Stoltze Land and Lumber Project (G0468)
Stoltze Land and Lumber Project is a 3.0 MW gas interconnection project in Flathead, Montana with a current status of operational. It is proposed to connect at Flathead 12.5 kV Radial from Trumble Creek Substation..
3.0 MWCapacity
OperationalStatus
MTMarket
GasTechnology
Project facts
| Canonical name | Stoltze Land and Lumber Project |
|---|---|
| Queue ID | G0468 |
| Status | operational |
| Source status | ENERGIZED |
| Market | MT |
| Technology | Gas |
| Capacity | 3.0 MW |
| State | Montana |
| County | Flathead |
| Point of interconnection | Flathead 12.5 kV Radial from Trumble Creek Substation. |
| Requested (queue) date | 2011-12-06 |
| Proposed in-service date | — |
| Operational date | 2013-10-01 |
| Withdrawn date | — |
| Developer | F.H. Stoltze Land and Lumber Co. |
| Utility / transmission owner | Bonneville Power Administration |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata