Stoltze Land and Lumber Project (G0468)

Stoltze Land and Lumber Project is a 3.0 MW gas interconnection project in Flathead, Montana with a current status of operational. It is proposed to connect at Flathead 12.5 kV Radial from Trumble Creek Substation..

3.0 MWCapacity
OperationalStatus
MTMarket
GasTechnology

Project facts

Canonical nameStoltze Land and Lumber Project
Queue IDG0468
Statusoperational
Source statusENERGIZED
MarketMT
TechnologyGas
Capacity3.0 MW
StateMontana
CountyFlathead
Point of interconnectionFlathead 12.5 kV Radial from Trumble Creek Substation.
Requested (queue) date2011-12-06
Proposed in-service date
Operational date2013-10-01
Withdrawn date
DeveloperF.H. Stoltze Land and Lumber Co.
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata