Storrie Lake Solar Project (58794_MSMPV)

Storrie Lake Solar Project is a 1.5 MW solar interconnection project in San Miguel, New Mexico with a current status of operational.

1.5 MWCapacity
OperationalStatus
PNMMarket
SolarTechnology

Project facts

Canonical nameStorrie Lake Solar Project
Queue ID58794_MSMPV
Statusoperational
Source status(OP) Operating
MarketPNM
TechnologySolar
Capacity1.5 MW
StateNew Mexico
CountySan Miguel
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2014-05-01
Withdrawn date—
Developer—
Utility / transmission ownerMSM Solar LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata