Stranger Creek 345kV (GEN-2018-059)

Stranger Creek 345kV is a 252.0 MW solar interconnection project in Leavenworth, Kansas with a current status of withdrawn. It is proposed to connect at Stranger Creek 345kV.

252.0 MWCapacity
WithdrawnStatus
KSMarket
SolarTechnology

Project facts

Canonical nameStranger Creek 345kV
Queue IDGEN-2018-059
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologySolar
Capacity252.0 MW
StateKansas
CountyLeavenworth
Point of interconnectionStranger Creek 345kV
Requested (queue) date2018-05-29
Proposed in-service date2024-12-31
Operational date
Withdrawn date2023-04-27
Developer
Utility / transmission ownerWERE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata