Sturtevant 115 kV SS - Sturtevant-Leeds-Livermore-Ludden-Riley Area Study (1449)

Sturtevant 115 kV SS - Sturtevant-Leeds-Livermore-Ludden-Riley Area Study is a 5.0 MW solar interconnection project in Franklin, Maine with a current status of withdrawn. It is proposed to connect at CMP Sturtevant 115 kV Substation.

5.0 MWCapacity
WithdrawnStatus
MEMarket
SolarTechnology

Project facts

Canonical nameSturtevant 115 kV SS - Sturtevant-Leeds-Livermore-Ludden-Riley Area Study
Queue ID1449
Statuswithdrawn
Source statusW
MarketME
TechnologySolar
Capacity5.0 MW
StateMaine
CountyFranklin
Point of interconnectionCMP Sturtevant 115 kV Substation
Requested (queue) date2023-09-29
Proposed in-service date2024-12-30
Operational date
Withdrawn date2025-06-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.