SUB 20.8 kV Load Addition (L0635)

SUB 20.8 kV Load Addition is a 8.0 MW other interconnection project with a current status of operational. It is proposed to connect at Alvey Substation.

8.0 MWCapacity
OperationalStatus
Market
OtherTechnology

Project facts

Canonical nameSUB 20.8 kV Load Addition
Queue IDL0635
Statusoperational
Source statusBPA COMPLETED
Market
TechnologyOther
Capacity8.0 MW
State
CountyLane
Point of interconnectionAlvey Substation
Requested (queue) date2024-10-24
Proposed in-service date
Operational date2025-09-01
Withdrawn date
DeveloperSpringfield Utility Board
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata