Sub 56 161 kV Substation (J1131) (J1477)

Sub 56 161 kV Substation (J1131) is a 50.0 MW battery interconnection project in Scott County, Iowa with a current status of operational. It is proposed to connect at Sub 56 161 kV Substation (J1131).

50.0 MWCapacity
OperationalStatus
Market
BatteryTechnology

Project facts

Canonical nameSub 56 161 kV Substation (J1131)
Queue IDJ1477
Statusoperational
Source statusDone
Market
TechnologyBattery
Capacity50.0 MW
StateIowa
CountyScott County
Point of interconnectionSub 56 161 kV Substation (J1131)
Requested (queue) date2019-04-29
Proposed in-service date2021-10-01
Operational date2021-10-01
Withdrawn date
Developer
Utility / transmission ownerMIDAMERICAN ENERGY CO.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.