Sub T to Maywood 345kV line (J2549)

Sub T to Maywood 345kV line is a 75.0 MW battery interconnection project in Clark, Missouri with a current status of withdrawn. It is proposed to connect at Sub T to Maywood 345kV line.

75.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameSub T to Maywood 345kV line
Queue IDJ2549
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity75.0 MW
StateMissouri
CountyClark
Point of interconnectionSub T to Maywood 345kV line
Requested (queue) date2022-09-14
Proposed in-service date2027-07-18
Operational date2027-07-18
Withdrawn date2023-03-24
Developer
Utility / transmission ownerAmeren Missouri

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.