Sugarloaf BESS (1573)

Sugarloaf BESS is a 180.0 MW battery interconnection project in Orange County, New York with a current status of withdrawn. It is proposed to connect at 138kV Sugarloaf Substation.

180.0 MWCapacity
WithdrawnStatus
GMarket
BatteryTechnology

Project facts

Canonical nameSugarloaf BESS
Queue ID1573
Statuswithdrawn
Source status0
MarketG
TechnologyBattery
Capacity180.0 MW
StateNew York
CountyOrange County
Point of interconnection138kV Sugarloaf Substation
Requested (queue) date2023-06-23
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperEmpire Reserve Energy, LLC
Utility / transmission ownerO&R

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata