SUN STREAMS SOLAR 3 (1433)

SUN STREAMS SOLAR 3 is a 150.0 MW solar interconnection project in Maricopa, Arizona with a current status of withdrawn. It is proposed to connect at Hassayampa Substation 500 kV .

150.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameSUN STREAMS SOLAR 3
Queue ID1433
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity150.0 MW
StateArizona
CountyMaricopa
Point of interconnectionHassayampa Substation 500 kV
Requested (queue) date2017-05-01
Proposed in-service date
Operational date
Withdrawn date2017-06-28
Developer
Utility / transmission ownerSDGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata