Sunbury #1 500kV (AH1-705 - moved to TC2)

Sunbury #1 500kV is a 32.4 MW gas interconnection project in Snyder, Pennsylvania with a current status of withdrawn.

32.4 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameSunbury #1 500kV
Queue IDAH1-705 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity32.4 MW
StatePennsylvania
CountySnyder
Point of interconnection
Requested (queue) date2025-04-07
Proposed in-service date2027-05-31
Operational date
Withdrawn date2025-12-03
Developer
Utility / transmission ownerPPL

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata