Sundance (55522_CT8)

Sundance is a 60.5 MW gas interconnection project in Pinal, Arizona with a current status of operational.

60.5 MWCapacity
OperationalStatus
WALCMarket
GasTechnology

Project facts

Canonical nameSundance
Queue ID55522_CT8
Statusoperational
Source status(OP) Operating
MarketWALC
TechnologyGas
Capacity60.5 MW
StateArizona
CountyPinal
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2002-06-01
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata