Sunflower Electric Power Corp's 345 kV Mingo substation (GEN-2021-045)

Sunflower Electric Power Corp's 345 kV Mingo substation is a 300.0 MW wind interconnection project in Sherman, Wallace, Kansas with a current status of withdrawn. It is proposed to connect at Sunflower Electric Power Corp's 345 kV Mingo substation.

300.0 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology

Project facts

Canonical nameSunflower Electric Power Corp's 345 kV Mingo substation
Queue IDGEN-2021-045
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyWind
Capacity300.0 MW
StateKansas
CountySherman, Wallace
Point of interconnectionSunflower Electric Power Corp's 345 kV Mingo substation
Requested (queue) date2021-04-28
Proposed in-service date2026-12-31
Operational date
Withdrawn date2022-11-23
Developer
Utility / transmission ownerSUNC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.