Sunnyside to Pooleville 138 kV line (GEN-2022-042)

Sunnyside to Pooleville 138 kV line is a 174.0 MW solar interconnection project in Carter, Oklahoma with a current status of withdrawn. It is proposed to connect at Sunnyside to Pooleville 138 kV line.

174.0 MWCapacity
WithdrawnStatus
OKMarket
SolarTechnology

Project facts

Canonical nameSunnyside to Pooleville 138 kV line
Queue IDGEN-2022-042
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologySolar
Capacity174.0 MW
StateOklahoma
CountyCarter
Point of interconnectionSunnyside to Pooleville 138 kV line
Requested (queue) date2022-06-23
Proposed in-service date2025-12-31
Operational date
Withdrawn date2025-03-06
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata