SUNSHINE VALLEY SOLAR 2 (994)

SUNSHINE VALLEY SOLAR 2 is a 50.0 MW solar interconnection project in Nye, Nevada with a current status of operational. It is proposed to connect at Valley Substation 138kV .

50.0 MWCapacity
OperationalStatus
—Market
SolarTechnology

Project facts

Canonical nameSUNSHINE VALLEY SOLAR 2
Queue ID994
Statusoperational
Source statusCOMPLETED
Market—
TechnologySolar
Capacity50.0 MW
StateNevada
CountyNye
Point of interconnectionValley Substation 138kV
Requested (queue) date2013-04-30
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerVEA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—operationalhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata