Susquehanna (R02)

Susquehanna is a 800.0 MW other interconnection project in Luzerne, Pennsylvania with a current status of withdrawn.

800.0 MWCapacity
WithdrawnStatus
—Market
OtherTechnology

Project facts

Canonical nameSusquehanna
Queue IDR02
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyOther
Capacity800.0 MW
StatePennsylvania
CountyLuzerne
Point of interconnection—
Requested (queue) date2006-08-25
Proposed in-service date2018-12-31
Operational date—
Withdrawn date2012-01-20
Developer—
Utility / transmission ownerPPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.