SW Energy (0595)

SW Energy is a 100.0 MW battery interconnection project in Cattaraugus, New York with a current status of withdrawn. It is proposed to connect at Five Mile Rd Substation 115kV.

100.0 MWCapacity
WithdrawnStatus
AMarket
BatteryTechnology

Project facts

Canonical nameSW Energy
Queue ID0595
Statuswithdrawn
Source status0
MarketA
TechnologyBattery
Capacity100.0 MW
StateNew York
CountyCattaraugus
Point of interconnectionFive Mile Rd Substation 115kV
Requested (queue) date2016-12-29
Proposed in-service date2021-08-31
Operational date
Withdrawn date
DeveloperNorth Park Energy, LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata