Sweetwater 230kV (GEN-2006-043)

Sweetwater 230kV is a 99.0 MW wind interconnection project in Beckham County, Oklahoma with a current status of operational. It is proposed to connect at Sweetwater 230kV.

99.0 MWCapacity
OperationalStatus
OKMarket
WindTechnology

Project facts

Canonical nameSweetwater 230kV
Queue IDGEN-2006-043
Statusoperational
Source statusIA FULLY EXECUTED/COMMERCIAL OPERATION
MarketOK
TechnologyWind
Capacity99.0 MW
StateOklahoma
CountyBeckham County
Point of interconnectionSweetwater 230kV
Requested (queue) date2006-11-17
Proposed in-service date
Operational date2008-08-01
Withdrawn date
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata