SWEPCO Midway Substation (AFS NJG-2026-006)

SWEPCO Midway Substation is a 34.2 MW gas interconnection project in Shreveport, Louisiana with a current status of unknown. It is proposed to connect at SWEPCO Midway Substation.

34.2 MWCapacity
UnknownStatus
LAMarket
GasTechnology

Project facts

Canonical nameSWEPCO Midway Substation
Queue IDAFS NJG-2026-006
Statusunknown
Source statusNone
MarketLA
TechnologyGas
Capacity34.2 MW
StateLouisiana
CountyShreveport
Point of interconnectionSWEPCO Midway Substation
Requested (queue) date2026-08-21
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerSWEPCO

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-13phase—04 SOUTHEASTlow
2026-09-10new_project—unknownhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.