Swift Solar (1392)

Swift Solar is a 300.0 MW other interconnection project in Herkimer, New York with a current status of withdrawn. It is proposed to connect at Edic - Princetown 345 kV #351 line.

300.0 MWCapacity
WithdrawnStatus
FMarket
OtherTechnology

Project facts

Canonical nameSwift Solar
Queue ID1392
Statuswithdrawn
Source status0
MarketF
TechnologyOther
Capacity300.0 MW
StateNew York
CountyHerkimer
Point of interconnectionEdic - Princetown 345 kV #351 line
Requested (queue) date2022-06-23
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperSwift Solar LLC
Utility / transmission ownerNYPA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata