Swope North 161 kV (GEN-2023-058)

Swope North 161 kV is a 150.0 MW battery interconnection project in Jackson, Missouri with a current status of withdrawn. It is proposed to connect at Swope North 161 kV.

150.0 MWCapacity
WithdrawnStatus
MOMarket
BatteryTechnology

Project facts

Canonical nameSwope North 161 kV
Queue IDGEN-2023-058
Statuswithdrawn
Source statusWITHDRAWN
MarketMO
TechnologyBattery
Capacity150.0 MW
StateMissouri
CountyJackson
Point of interconnectionSwope North 161 kV
Requested (queue) date2023-10-02
Proposed in-service date2026-12-31
Operational date—
Withdrawn date2023-12-19
Developer—
Utility / transmission ownerEvergy

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata