T14 Circuit 115kV line is a 75.0 MW solar interconnection project in Lea, New Mexico with a current status of active. It is proposed to connect at T14 Circuit 115kV line.

75.0 MWCapacity
ActiveStatus
NMMarket
SolarTechnology

Project facts

Canonical nameT14 Circuit 115kV line
Queue IDGEN-2018-004
Statusactive
Source statusIA FULLY EXECUTED/ON SCHEDULE
MarketNM
TechnologySolar
Capacity75.0 MW
StateNew Mexico
CountyLea
Point of interconnectionT14 Circuit 115kV line
Requested (queue) date2018-04-26
Proposed in-service date2027-03-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.