T14 Circuit 115kV (GEN-2025-SR29)

T14 Circuit 115kV is a 75.0 MW battery interconnection project in Hobbs, New Mexico with a current status of active. It is proposed to connect at T14 Circuit 115kV.

75.0 MWCapacity
ActiveStatus
NMMarket
BatteryTechnology

Project facts

Canonical nameT14 Circuit 115kV
Queue IDGEN-2025-SR29
Statusactive
Source statusIA PENDING
MarketNM
TechnologyBattery
Capacity75.0 MW
StateNew Mexico
CountyHobbs
Point of interconnectionT14 Circuit 115kV
Requested (queue) date2025-08-18
Proposed in-service date2027-03-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata