Tacoma Power TC-PSE is a 83.0 MW gas interconnection project in Skagit, Washington with a current status of withdrawn. It is proposed to connect at 230 kV Sedro Wooley-Bellingham line.

83.0 MWCapacity
WithdrawnStatus
WAMarket
GasTechnology

Project facts

Canonical nameTacoma Power TC-PSE
Queue IDG53
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyGas
Capacity83.0 MW
StateWashington
CountySkagit
Point of interconnection230 kV Sedro Wooley-Bellingham line
Requested (queue) date2001-05-04
Proposed in-service date2002-01-01
Operational date
Withdrawn date
DeveloperCity of Tacoma, Department of Public Utilities, Light Division
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata