Talisheek - Bogalusa 230 kV Line (J1564)

Talisheek - Bogalusa 230 kV Line is a 100.0 MW solar interconnection project in Washington, Louisiana with a current status of operational. It is proposed to connect at Talisheek - Bogalusa 230 kV Line.

100.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameTalisheek - Bogalusa 230 kV Line
Queue IDJ1564
Statusoperational
Source statusDone
Market
TechnologySolar
Capacity100.0 MW
StateLouisiana
CountyWashington
Point of interconnectionTalisheek - Bogalusa 230 kV Line
Requested (queue) date2020-06-08
Proposed in-service date2023-09-01
Operational date2023-09-01
Withdrawn date
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata