Talladega Energy Storage (26-IC-1434)

Talladega Energy Storage is a 200.0 MW battery interconnection project in Talladega County, Alabama with a current status of operational.

200.0 MWCapacity
OperationalStatus
ALMarket
BatteryTechnology

Project facts

Canonical nameTalladega Energy Storage
Queue ID26-IC-1434
Statusoperational
Source status
MarketAL
TechnologyBattery
Capacity200.0 MW
StateAlabama
CountyTalladega County
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata