Tap 765kV line between proposed Twin Counties to Tulsa North substation (GEN-2017-062)

Tap 765kV line between proposed Twin Counties to Tulsa North substation is a 488.0 MW other interconnection project in Beaver County, Oklahoma with a current status of withdrawn. It is proposed to connect at Tap 765kV line between proposed Twin Counties to Tulsa North substation.

488.0 MWCapacity
WithdrawnStatus
OKMarket
OtherTechnology

Project facts

Canonical nameTap 765kV line between proposed Twin Counties to Tulsa North substation
Queue IDGEN-2017-062
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyOther
Capacity488.0 MW
StateOklahoma
CountyBeaver County
Point of interconnectionTap 765kV line between proposed Twin Counties to Tulsa North substation
Requested (queue) date2017-05-31
Proposed in-service date
Operational date
Withdrawn date2018-10-01
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.